LOG IN
STAGE 2 YELLOW
2032 E Hickory Hill Rd, Argyle, TX 76226
HOME
LOG IN
ABOUT US
HISTORY
CONSUMER INFORMATION
BOARD MEMBERS
MANAGEMENT & STAFF
MEET THE TEAM
REPORTS AND NEWS
BOARD MEETINGS
WATER CONSERVATION/RESTRICTIONS
CONSUMER CONFIDENCE REPORTS
OTHER NEWS
FAQ
F.A.Q. – WATER BILLING
F. A. Q. – WATER LEAKS
FORMS
NEW/DISCONTINUING MEMBERS
BUILDERS/CONTRACTORS
LANDLORD/RENTERS
SERVICE AREA
RATES
CONTACT US
CONTACT US
CAREERS
Available 24/7
(940) 584-0780
HOME
LOG IN
ABOUT US
HISTORY
CONSUMER INFORMATION
BOARD MEMBERS
MANAGEMENT & STAFF
MEET THE TEAM
REPORTS AND NEWS
BOARD MEETINGS
WATER CONSERVATION/RESTRICTIONS
CONSUMER CONFIDENCE REPORTS
OTHER NEWS
FAQ
F.A.Q. – WATER BILLING
F. A. Q. – WATER LEAKS
FORMS
NEW/DISCONTINUING MEMBERS
BUILDERS/CONTRACTORS
LANDLORD/RENTERS
SERVICE AREA
RATES
CONTACT US
CONTACT US
CAREERS
Customer Service Inspection Certifications Survey
CUSTOMER SERVICE INSPECTION CERTIFICATIONS (Section 290.46) SURVEY FORM
Membership Number (required)
Membership Name(required)
CTWSC TCEQ ID: 0610020
I, (your name required)
upon inspection of the private plumbing facilities located at (your service address required)
which is connected to CTWSC water system, do hereby certify that, to the best of my knowledge:
(Reason for Inspection required)
New Construction
Existing service where contaminant hazards suspected
Major renovation or expansion of distribution facilities
1. No direct connection between CTWSC water system and a potential source of contamination exists. Potential sources of contamination are isolated from the public water system by an air gap or an appropriate backflow prevention assembly in accordance with Commission regulations. Additionally, all pressure relief valves and thermal expansion devices are in compliance with state plumbing codes.
In Compliance
Out of Compliance
New Construction Can Not Be Determined At This Time
2. No cross-connections between the CTWSC water system and a private water system exist. Where an actual air gap is not maintained between the public water supply and a private water supply, an approved reduced pressure-zone backflow prevention assembly is properly installed and a service agreement exists for annual inspection and testing by a certified backflow prevention assembly tester.
In Compliance
Out of Compliance
New Construction Can Not Be Determined At This Time
3. No connection exists which would allow the return of water used for condensing, cooling or industrial processes back to the CTWSC water system.
In Compliance
Out of Compliance
New Construction Can Not Be Determined At This Time
4. No pipe or pipe fitting which contains more than 8.0% lead exists in private plumbing facilities installed on or after July 01, 1988.
In Compliance
Out of Compliance
New Construction Can Not Be Determined At This Time
5. No solder or flux which contains more than 0.2% lead exists in private water distribution facilities installed on or after July 1, 1988.
In Compliance
Out of Compliance
New Construction Can Not Be Determined At This Time
6. No plumbing fixture is installed which is not in compliance with a state approved plumbing code.
In Compliance
Out of Compliance
New Construction Can Not Be Determined At This Time
Tester Name (required)
Your Email (required)
Tester Number (required)
Record Test Date (required)
Where a serious threat to the public health or to the public drinking water supply exists, CTWSC shall not provide water service or restore service to a private plumbing facility until the above conditions are determined to be in compliance. I further certify that the following materials were used in the installation of the plumbing facilities:
Service Line To Structure (required)
Lead
Copper
PVC
Other
By Plumber (required)
Yes
No
Service Line To Solder (required)
Lead Free
Solvent Weld
PVC
Other
By Plumber(required)
Yes
No
Service Line To Main (required)
Lead
Copper
PVC
Other
By CTWSC (required)
Yes
No
By Plumber (required)
Yes
No
I recognize that this document shall become a permanent record of the CTWSC and that I am legally responsible for the validity of the information I have provided.
Digital Signature (required)
Project/Plumber Firm (required)
Texas Plumbing License (required)